The cross, located at the edge of the forest near the old inn, is a remarkable testimony to history. It commemorates the historic meeting of the commanders of the Austro-Hungarian armies during Napoleon's invasion. This memorial site, a symbol of the Napoleonic wars, is currently in a tragic state - the foundation has been destroyed, and the surrounding area urgently needs to be cleaned and secured.
Scope of renovation work:
- Placing a new foundation:
A stable and durable support that will ensure the monument's longevity. - Cleaning the surrounding area:
Restoring the surroundings of the monument to a dignified appearance. - Fencing the monument with a chain:
Securing the space around the cross and making it aesthetically pleasing. - Installation of an information board:
Placing a historical description, introducing the importance of the site to visitors.
A detailed cost estimate for the project:
1. erecting a new foundation (2 m²):
- Materials:
- Cement and concrete (bags of 25 kg) - PLN 300
- Reinforcing steel (rebar) - PLN 200
- Wooden formwork - PLN 100
- Labor:
- Preparation of the excavation (2 m² × PLN 50) - PLN 100
- Installation of formwork and reinforcement - 300 zł
- Pouring of concrete and leveling - PLN 200
- Total for foundation: PLN 1,200
2. cleaning the area around the monument (20 m²):
- Labor costs:
- Removal of weeds, bushes and moss (20 m² × 10 PLN) - 200 PLN
- Removal and disposal of green waste - PLN 100
- Cleaning and leveling of the area - PLN 100
- Total for clearing the area: PLN 400
3. fence the monument with a chain (10 running meters):
- Materials:
- Decorative chain (10 m × PLN 75) - PLN 750
- Steel posts (4 pieces × PLN 150) - PLN 600
- Anti-corrosion paint for chain and posts - £100
- Labor:
- Preparation of holes for posts (4 holes × PLN 50) - PLN 200
- Installation of posts and chain - PLN 550
- Total for fencing: PLN 2,100
4. installation of an information board:
- Materials:
- Information board made of aluminum (60 x 40 cm) - PLN 700
- Board frame (steel or aluminum) - PLN 300
- Labor:
- Assembly of the frame - PLN 100
- Board installation and position correction - PLN 100
- Total for the board: PLN 1,200
Cost Summary:
- Laying the foundation: PLN 1,200
- Site cleanup: PLN 400
- Monument fencing: PLN 2,100
- Installation of an information board: PLN 1,200
Total project cost: ~£4,900
How can you help?
Every donation helps save this remarkable memorial site, restoring it to its former glory and securing it for future generations. Your support will make possible not only the restoration, but also the preservation of an important piece of our shared history. Thank you for your commitment to preserving cultural heritage!